CleanAir
Home  Services Equipment Search
Overview
Air Quality Consulting / Management
Analytical Services
Chromatography and Wet Methods
Coating and Ink Analysis
ESP Modeling
Flue Gas Desulfurization System Sample Analyses
Flyash Analysis
Gravimetric Analysis
Inorganic Analysis
Organic Analysis
Particle Characterization
Resistivity Analysis
Resistivity and Particle Size Introduction
Function of Temperature
Fig. 1: Temp. vs. Resistivity
Resistivity in Simulated Flue Gas
Table 1: Coal and Ash Chemistry
Fig. 2: Resistivity vs. Electric Field
Fig. 3: Resistivity Model
Particle Size Distribution
Fig. 4: Bahco Particle Size
Greenhouse Gas Management
Mercury Monitoring
Performance / Efficiency
Performance Test Instrumentation Support
Stack / Source Emissions Testing

 

online chat

SEARCH BY
Industry
Method

 

Rush Analysis Pricing

Analytical results will be issued 15 working days from the receipt of samples. Rush analytical results may be available at increased rates upon request. Rush charges for analysis will be applied in the following manner:

1-2 working days

300% of listed price - Guaranteed start of analysis on day of sample receipt

3-5 working days

200% of listed price - Within three days of sample receipt

6-10 working days

150% of listed price - Within six days of sample receipt

In any circumstance, a purchaser's request for rush analysis in a certain time frame authorizes all degrees of rush charges up to that extent. Rush charges on the final invoice will be reflective of when results were available and reported to the purchaser. All days will be calculated on a five day work week (with allowance for holidays).

How to Avoid Rush Charges
To avoid rush charges but still receive results in a short turnaround period, contact Clean Air Analytical Services before your samples are taken or ready to be shipped. Upon CleanAir's receipt of a purchase order and a date of the samples arrival, the standard 15 day turnaround period begins. For example, if we received the purchase order today, and the samples were to arrive at Clean Air in two weeks, the analysis would be completed one week after the samples arrived. If the samples do not arrive on the day the client initially states, the turnaround time is delayed by the same amount and rush charges may still be applied.

NOTE: Rush charges do not apply to tared filter media.

All analyses will be performed according to Clean Air Engineering's Terms and Conditions for Laboratory Work.

 

Sitemap | Terms of use

Clean Air Engineering, Inc.
500 W. Wood Street
Palatine, IL 60067, USA
800-627-0033>

www.cleanair.energy © 2009-2012 Clean Air Engineering, All Rights Reserved